Customization: | Available |
---|---|
Material: | Natural Rubber |
Capability: | Water Rubber Hose |
Still deciding? Get samples of US$ 0.8/Meter
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Low-Pressure Rubber Hose
A low-pressure rubber hose is a hose made of rubber material, which is soft, fold-resistant, corrosion-resistant, and wear-resistant. It is usually used to transport low-pressure liquids or gases. It is widely used in industry, agriculture, construction, automobiles, etc. Low-pressure rubber hoses have become an indispensable part of many systems due to their excellent performance and adaptability.
Inner Diameter | Outer Diameter | Weight | W.P.(at 23ºC) | Std Length | ||||
inch | mm | inch | mm | kg/m | bar | psi | m | ft |
1/4 | 6.5 | 0.472 | 12 | 0.11 | 20 | 300 | 100 | 300 |
5/16 | 8.5 | 0.551 | 14 | 0.13 | 20 | 300 | 100 | 300 |
3/8 | 10 | 0.629 | 16 | 0.17 | 20 | 300 | 100 | 300 |
1/2 | 13 | 0.787 | 20 | 0.25 | 20 | 300 | 100 | 300 |
5/8 | 16 | 0.984 | 25 | 0.39 | 20 | 300 | 100 | 300 |
3/4 | 19 | 1.102 | 28 | 0.45 | 20 | 300 | 50 | 150 |
1 | 25 | 1.338 | 34 | 0.56 | 20 | 300 | 50 | 150 |
Q1. What are your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have a legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What are your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What are your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 10 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive prices to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.